Home/Resources

Resources Know what to expect before it happens.

A page from a real report, the defects we find most often on Central Florida builds, and straight answers to the questions buyers ask us every week. All of it is free to read, whether you hire us or not.

Why this library exists.

Most of the people we work for are buying their first new-construction home, and a good number of them are buying it from another state. They are handed a schedule, a set of plan selections and a series of walkthroughs, and at no point does anyone tell them what a normal house looks like halfway through being built.

That is a hard position to be in. Without a reference point, every crack looks serious and every delay looks like a problem, or else nothing looks like a problem at all until the drywall is up and the question is no longer easy to answer. Buyers end up guessing about which items are worth raising and which ones are simply how a house gets built in the Central Florida region.

These pages are the reference point. They show what a finished report looks like before you pay for one, what we look at during each of the four stages, and what routinely turns up at each of them. Read them and you will walk your site with a better idea of what you are looking at, which makes the conversations with your construction manager shorter and more useful.

Nothing here is gated. If it helps you build a better house with a builder you like, that is a good outcome for everybody.

Looking for the inspections themselves?

All inspections

Pre-Slab Inspection

Forms, reinforcement, chairs, vapor barrier and under-slab systems, reviewed 2 to 3 days before concrete is placed.

Stage 1 · 1 to 2 hours

Pre-Drywall Inspection

Framing, connectors, rough-in and flashing, after rough-in passes and before insulation goes in.

Stage 2 · 3 to 5 hours

Pre-Closing Inspection

A full walk of the finished home with every system operated, 7 to 10 days before closing.

Stage 3 · 3 to 5 hours

11-Month Warranty Inspection

A second full look in month 11, while your builder's warranty period is still open for what has moved.

Stage 4 · 3 to 5 hours

The Inspection Timeline

How the four stages fit together across a typical Central Florida build and how much notice each one needs.

All four stages

Read enough? Get on the calendar.

Tell us your builder, your community and where the build is today, and we will tell you which inspection comes next.

Phone407-863-2663
Emailinfo@thinkhomeiq.com
HoursWeekdays, early evenings and weekends by appointment
Book an inspection Call